Greetings,
The Contractor installing the security system is 80% complete. The last remaining installation items include the two new call boxes (Main Ped. Gate & 2nd Floor Lobby Doors). To allow us to get through the weekend, they have made some temporary connections between new and old equipment. The rest of the install will be completed early next week. Due to the holiday the vendor will keep us posted on timing - we will pass along information as appropriate.
Please be aware of the following:
The Main Pedestrian Gate requires either your key, old 4-digit code, or your old fob to gain access. Guest access will work the same.
The Lobby Doors, either use your new fob, key, or it will recognize the "Open Path" Phone App. to gain access into the building.
The Lower Lobby, either use your new fob, key, or it will recognize the "Open Path" Phone App. to gain access into the building.
Dock Gate, either use your new fob, key, or it will recognize the "Open Path" Phone App. to gain access into the building.
***Openpath Mobile App instructions can be found here (CLICK HERE). You will receive an email from Open Path at some point over the weekend, but here are instructions I've created for those who wish to get a head start. In person Training Sessions by Phil Copley will be held during a variety of times over the next two weeks.